Alfa Romeo Tonale Forum banner

Hello from San Diego

356 Views 13 Replies 5 Participants Last post by  TonaleV
Hello from San Diego
1 - 14 of 14 Posts
Welcome to the forum @Bob B. Did you already order a Tonale?
Hello from San Diego
Welcome Bob! I see on another post you have a Stelvio currently. How has it been treating you? What convinced you to go with the Tonale as your next Alfa?
hey neighbor, what model and color Tonale did you order?
hey neighbor, what model and color Tonale did you order?
hey neighbor, what model and color Tonale did you order?
2024 Tonale Veloce, Alfa Black, premium interior package, active assist package
Welcome to the forum @Bob B. Did you already order a Tonale?
Yes, ordered in mid February. 2024 Tonale Veloce, Alfa Black, premium interior package, active assist package
Does anyone know what these codes from my 2024 Tonale vehicle order form mean?

Status: D - Firm schedule: serial number is assigned
PSP Month/Week: 04/4
Build Priority: 01

Thank you...
Welcome Bob! I see on another post you have a Stelvio currently. How has it been treating you? What convinced you to go with the Tonale as your next Alfa?
I've owned 2 Alfa Stelvio Sport Ti (s) and my current lease is up June 1. Wanted something a little newer, more tech and hybrid. The new Tonale Veloce is a perfect fit.
Does anyone know what these codes from my 2024 Tonale vehicle order form mean?

Status: D - Firm schedule: serial number is assigned
PSP Month/Week: 04/4
Build Priority: 01

Thank you...
Does anyone know what these codes from my 2024 Tonale vehicle order form mean?

Status: D - Firm schedule: serial number is assigned
PSP Month/Week: 04/4
Build Priority: 01

Thank you...
@Bob B If it follows this Hornet build classification below it means that your build will take place with
all parts on hand and production in the 4th week of April. When did your dealer place the order?
The sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status because there seems to be no rhyme or reason to dime orders taking 2 weeks and others 10+ weeks.

BA: New order that hasn't been checked
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm - Tentative schedule
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Vendor Abyss!!!
JE: Emission check
JS: Shipped to storage, really? Someone else near me needs a Jeep or 3!
KZ: Released by plant , invoiced (window sticker)
KZL: Released - not shipped (see JS)
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds (see JS)
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
See less See more
I've owned 2 Alfa Stelvio Sport Ti (s) and my current lease is up June 1. Wanted something a little newer, more tech and hybrid. The new Tonale Veloce is a perfect fit.
@Bob B If it follows this Hornet build classification below it means that your build will take place with
all parts on hand and production in the 4th week of April. When did your dealer place the order?
The sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status because there seems to be no rhyme or reason to dime orders taking 2 weeks and others 10+ weeks.

BA: New order that hasn't been checked
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm - Tentative schedule
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Vendor Abyss!!!
JE: Emission check
JS: Shipped to storage, really? Someone else near me needs a Jeep or 3!
KZ: Released by plant , invoiced (window sticker)
KZL: Released - not shipped (see JS)
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds (see JS)
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
Dealer order was placed 2/21/23
Dealer order was placed 2/21/23
Good to know. My dealer order was 3/20/23
and hoping to get one by this June.
hmmm

I ordered mine on Saturday, 3/17/23 - gave the dealer the $1000.00 deposit via CC.
Status BA - Pending Order
Scheduling Priority: 1 - Sold order
Build priority: 99

not sure if it went thru?
hmmm

I ordered mine on Saturday, 3/17/23 - gave the dealer the $1000.00 deposit via CC.
Status BA - Pending Order
Scheduling Priority: 1 - Sold order
Build priority: 99

not sure if it went thru?
If Alfa added second shift to increase production to 400 a day x 5 days a week, that equals 2000 cars a week. That equates to 8000+ cars a month. By the end of May 16,000 cars for North American market.
I haven’t heard how many preorders Alfa received but I think it is well under that number. Expecting early June arrival for mine. Fingers crossed.
  • Like
Reactions: 1
1 - 14 of 14 Posts
Top