Welcome to the forum @Bob B. Did you already order a Tonale?
Welcome Bob! I see on another post you have a Stelvio currently. How has it been treating you? What convinced you to go with the Tonale as your next Alfa?Hello from San Diego
hey neighbor, what model and color Tonale did you order?
2024 Tonale Veloce, Alfa Black, premium interior package, active assist packagehey neighbor, what model and color Tonale did you order?
Yes, ordered in mid February. 2024 Tonale Veloce, Alfa Black, premium interior package, active assist packageWelcome to the forum @Bob B. Did you already order a Tonale?
I've owned 2 Alfa Stelvio Sport Ti (s) and my current lease is up June 1. Wanted something a little newer, more tech and hybrid. The new Tonale Veloce is a perfect fit.Welcome Bob! I see on another post you have a Stelvio currently. How has it been treating you? What convinced you to go with the Tonale as your next Alfa?
@Bob B If it follows this Hornet build classification below it means that your build will take place withDoes anyone know what these codes from my 2024 Tonale vehicle order form mean?
Status: D - Firm schedule: serial number is assigned
PSP Month/Week: 04/4
Build Priority: 01
Thank you...
I've owned 2 Alfa Stelvio Sport Ti (s) and my current lease is up June 1. Wanted something a little newer, more tech and hybrid. The new Tonale Veloce is a perfect fit.
Dealer order was placed 2/21/23@Bob B If it follows this Hornet build classification below it means that your build will take place with
all parts on hand and production in the 4th week of April. When did your dealer place the order?
The sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status because there seems to be no rhyme or reason to dime orders taking 2 weeks and others 10+ weeks.
BA: New order that hasn't been checked
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm - Tentative schedule
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Vendor Abyss!!!
JE: Emission check
JS: Shipped to storage, really? Someone else near me needs a Jeep or 3!
KZ: Released by plant , invoiced (window sticker)
KZL: Released - not shipped (see JS)
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds (see JS)
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
Good to know. My dealer order was 3/20/23Dealer order was placed 2/21/23
If Alfa added second shift to increase production to 400 a day x 5 days a week, that equals 2000 cars a week. That equates to 8000+ cars a month. By the end of May 16,000 cars for North American market.hmmm
I ordered mine on Saturday, 3/17/23 - gave the dealer the $1000.00 deposit via CC.
Status BA - Pending Order
Scheduling Priority: 1 - Sold order
Build priority: 99
not sure if it went thru?